Our services as per petroleum rule / SMPV rules
1. Preparation of Drawings:
To prepare Design Engineering Drawing as per Petroleum Rule 2002 /SMPV RULE for installation Layout and key plan after taking actual measurement at site or drawing available with you.
2. Inspection and issuance of Certificate Under Petroleum /SMPV Rule Our competent Person shall visit your installation for carrying out test as per rule and issue certificate of safety after completion of installation as per approved plan.
The job includes
B) Witnessing the testing of safety relief Valves as per latest circular and to be Certified under rule 33